WARRANT
AND RECOMMENDATIONS
FALL TOWN MEETING
NOVEMBER 10, 2009
ARTICLE |
PROPONENT |
DESCRIPTION |
October
24, 2009
The
Advisory Board is pleased to present the warrant and its
recommendations for the upcoming town meeting. We anticipate a robust
discussion of issues very important for the town and urge you to come
to the meeting and contribute to the debate.
The
dominant issues on the warrant are recommendations for the town to
proceed with approximately $47 million in construction of a
replacement for the existing Freeman Centennial School and Public
Safety building. The school accounts for approximately $37 million of
this investment and the public safety building approximately $10
million.
There
are two key considerations behind our recommendation to proceed with
both these investments and a third consideration unique to the school.
First,
the need for the proposed new construction has been clearly
established. The alternative to not replacing the buildings would be
repair and refurbishments to the existing buildings. Those expenses
would be funded from the town’s operating budget (which, as you will
recall, has been stripped of all capital spending for repairs and
refurbishments for the last two years). The building committees have
estimated that the necessary repairs and refurbishments would, over
the next ten years, be comparable to or in excess of the cost to the
town of the new construction.
Second,
the current weak construction market will allow the town to realize
significant savings relative to past periods or likely future
conditions. The building committees have both suggested that savings
in excess of 10% of the proposed construction budget could be realized
if the town acts promptly.
We
believe these considerations are sufficiently compelling to justify
the investments.
In
addition, the new school construction has been approved by the state
to receive a subsidy for the new construction, for approximately 47%
of the total cost of the program (and 53% of the cost of the
components that meet state minimum requirements). That subsidy is
worth about $17 million to Norfolk. It is likely that Norfolk will
lose eligibility for that support unless it acts promptly to approve
the new school. The availability of this subsidy, provided by
taxpayers of the entire state, provides a significant incentive to
proceed with the school.
It
should be noted that the new building recommendations represent many
years of thought and investment on the part of the town. Most recently
the town funded its share of a $0.5 million feasibility study
confirming the need for the new school, preparing a design, and
supporting the application to the state for support. The town has
spent approximately $0.5 million to acquire land for the new public
safety building and to prepare the initial designs and proceed with
plans as required by the state. The AB believes the resulting
proposals reflect careful thought and commitment of substantial
resources and have resulted in the best options for the town.
In
making its recommendations the AB is mindful of the continued
financial stress of the town and its citizens. We are entering the
second year of the worst post-war recession and the situation is
likely to get worse before it gets better. Cuts in state aid for the
current year and even more substantial cuts for next year’s budget are
likely. Cost savings and funding from one-time sources that benefited
this year’s budget are not likely to be realized next year.
Those
reductions in state aid and increased costs will have to be offset by
cuts in town services or an increase in our taxes – most likely a
combination of both.
The
AB has struggled to balance these deep financial stresses with the
need to invest in the new school and public safety building. We are
concerned that our recommendations clearly reflect a sound and prudent
plan for the town. How can we recommend expanding the town’s
infrastructure knowing that we will in the near future recommend cuts
in services and increases in taxes for operating purposes?
Three
considerations guide our recommendation in these difficult times.
First is that the proposed investments are necessary to maintain
Norfolk’s existing level of educational and public safety services.
The proposed plans do account for changing educational standards and
practice but are not an investment in expanded services. If the town
does not support these investments to maintain service standards we
recommend that it make some hard decisions on how to trim services and
reduce ambitions for quality of life in the town.
Second
we believe that the current financial crisis will not last
indefinitely. The overall economy is likely to improve, state support
for Norfolk’s budget is likely to increase modestly, and the
investments the town has made in encouraging commercial development
will expand its tax base. These factors lead us to believe that the
town’s financial resources will recover and expand over time, easing
the current strains.
Finally
(but perhaps least satisfyingly) if we don’t replace the school and
public safety buildings we will have to repair them. Those repairs are
going to be expensive and unsatisfactory in light of the sadly
deteriorated condition of the existing buildings. And they will have
to be funded from the town’s operating budget at the expense of
existing services.
We
do not want to overlook articles in the warrant to support a road
maintenance over-ride; to fund a new town well; revise town bylaws for
office hours, senior citizens property tax deferrals and political
signage; and to buy a police cruiser. We support these proposals and
believe they are relatively non-controversial.
Come
to the town meeting on the 10th of November. Listen to the
questions and concerns of your neighbors. Make sure that your
questions and concerns are addressed. We look forward to seeing you
there!
Hereof, fail not,
but make due return of this warrant, with you doings thereon to the
Town Clark, on or before the hour of said meeting. Given under our
hands and seal of the Town of Norfolk on the 13th day of
October, 2009 A.D.
NORFOLK BOARD OF SELECTMEN
James C. Lehan, Chairman
Robert J. Garrity, Vice
Chairman
James M. Tomaszewski, Clerk
A true copy, attest:
Town of Norfolk
Norfolk,
ss
By virtue of this
Warrant, I have notified and warned the legal voters of the Town of
Norfolk aforesaid to meet at the time and place and for the purposes
specified in said Warrant, by posting true and attested copies thereof
in the Town Hall, and in at least one public place in each of the four
(4) precincts, not less than fourteen (14) days at least before the
date of said meeting.
Constable
Date
In
the year 2000 the Town of Norfolk recognized the need for a new school
building to replace the aging Freeman Centennial School. As a result,
the Norfolk School Building Task force was created. Their efforts in
getting a school project off the ground were halted with the
unfortunate and abrupt end of the state committee overseeing school
building construction. The state, concerned over misappropriation of
finances and overall mismanagement called for a moratorium on funding
for all school construction.
With
the newly appointed Massachusetts School Building Authority (MSBA), the Town of
Norfolk, realizing the urgency for a new school, quickly jumped at the
opportunity. On September 20, 2009, after more than 16 months of meetings and
negotiations, both with the newly formed Norfolk School Building Committee and
MSBA, Norfolk was granted approval, with 53.16% state reimbursement, to begin
construction of a new grade 3 – 6 elementary school. This was all predicated on
securing approval of the town.
The
agreement between MSBA and Norfolk was for a Total Facilities Grant (TFG) of
$32,500,093 and a Total Project Budget (TPB) of $36,893,050 with a
reimbursement of $17,277,050. The difference in the TFG and TPB of $4 Million
is a combination of floor asbestos abatement, building site work (additional
parking, septic system, fire lane, demolition of the existing building) and
alternatives such as administrative offices, a larger gymnasium, photovoltaic
system (approx. $300,000 reimbursed through a grant), Norfolk Cable TV/SACC/
Recreation, and restoration of one ball field. While the cost to the town is in
the $19M range spread out over 20 years, the estimated cost of doing necessary
repairs, maintenance, and safety upgrades on the existing building is $16.6 M
over 10 years, with the inevitable reality of still building a new facility
down the road.
Some
will challenge the idea of building a new school in the economic climate that
we are currently in. I would counter that explaining that these couldn’t be
better times to build. As State Treasure Tim Cahill stated at our last meeting,
construction costs, labor, materials, and interest rates are ALL at record
lows. Now is the time to get things done. Construction projects across the
state are coming in 5 – 12% below bid estimates. This is a savings of millions
of dollars to the taxpayers. On top of this, the tax impact won’t begin until
2014. It is hoped that by this time both the economic climate and the job
market will be in full recovery mode.
One
of the major changes at the MSBA, along with stringent accountability to the
tax payers of Massachusetts, has been with its timetable and local acceptance
of state reimbursement money. Districts no longer have the luxury of voting
numerous times to get a project passed. New MSBA guidelines allow districts a
120 day window from the approval date, which in our case was September 20, to
get town support. If the Town of Norfolk fails to pass this generous $17 M
reimbursement in the November Town Meeting and the December 8 vote, the
contract would become null and void and Norfolk would be removed from the list.
On top of this, the $500,000 already appropriated for the hiring of an Owners
Project Manager, architects, feasibility study, site survey, etc., would be for
naught.
This new building is being designed to be more than
just a top notch educational facility. It is being developed with the town in
mind. Before and after school facilities, Norfolk Cable TV, and a gymnasium
capable of handling recreation programs and adult leagues are all part of the
proposal. Special education classes, recreation camps, and adult fitness
opportunities would all be possible during the summer months, as well as during
the school year.
In
conclusion, the Town of Norfolk has a one shot, golden opportunity to build a
first rate, technologically savvy, multi-faceted, green school with a state
reimbursement rate of 53.16% or $17,277,050. The ramifications of not
capitalizing on this opportunity would inevitably require the town to spend
roughly $16 million updating a 60 year old building with 0% reimbursement. The
time is NOW! We have one shot to carpe diem. The Town of Norfolk, and more importantly the students of
Norfolk, deserve an educationally appropriate, safe, and green school to propel
them into the future.
Norfolk has been
considering a new Public Safety Building for the better part of a decade now,
going back to the Clinton Administration. Town Meeting has been supportive of a
new building at least four times, approving $30,000 for a feasibility study
back in the early 2000’s, supporting the borrowing for feasibility study along
with the creation of a ballot question for authorization to borrow the full
construction costs back in 2008, funding the $250,000 purchase of adjacent property
and then, most recently, the borrowing of $295,000 to conduct a full
feasibility study, preparing for the question we have before you today. It is
now time to complete this work and construct a new building.
Recently the Town also
formed the Public Safety Building Committee “PSBC” made up of Town officials
and interested residents who offer a tremendous amount of experience and
expertise to this process.
In the short time since
the Annual Town Meeting concluded in June the PSBC has worked diligently with
our architect to define the space needs of the departments, design the floor
plan of the building and then work through the painful process of compromising
to keep the building project within the construction budget as set by the
committee. This hasn’t been easy, but as of press time, we’re almost there and
expect to bring the project to Town Meeting at a price below $10,000,000.
As with the school
building project, some will question whether this is the time to ask the Town
for a tax increase to fund this project. The answer is yes, and there are two
very important reasons.
The first reason that
this is the right time is for financial concerns. We all fully understand
today’s current economic climate and the challenges we all face. The good news
is that there hasn’t been a construction climate like this in a long time and
projects that are going “out to bid” are coming in 10 – 15% below estimated
costs. This is great news and an opportunity to construct a building today for
significantly less than we might be able to in a few short years. The
difference will easily reach 20 – 30 % which will mean millions of dollars.
The second and equally
important reason is that we NEED this building to safely perform our Public
Safety operations. Despite the external appearance of our current facility,
which looks all too good from Main Street, the inside of the Public Safety
Building is inadequate for today’s operations. This building was built in 1966,
with an addition in 1984, for 4 Police Officers a volunteer Fire Department and
a dispatcher that worked from her home. Today we operate with 17 Police
Officers, 2 Civilian Administrative Support team members, 13 Career Fire
Fighters with 6 Call Staff, an Animal Control Officer and 4 full time
Dispatchers.
The
alternative is to do nothing. This is not a good choice. Let’s focus of the
financial implications. The state of the building is poor. We have already
battled mold in the building and we know that the ventilation system cannot
adequately offset the impact of the diesel engines. We know we need to
dramatically improve the technological infrastructure to handle the ever
growing complexities of the communications systems that are in use today. The
prison cells need to be improved to keep our prisoners and officers safe and to
meet the State’s standards. The roof has been a constant battle during the life
of this building and without a new building it too, would likely need a major
overhaul.
The garage bays for the
Fire Equipment are too small and not properly outfitted to today’s equipment.
The Sally Port is too small to safely transfer a prisoner to the building. In
addition to the things that are in bad shape we also have to deal with those
things that we don’t have today. Without a new building we would need to add
proper locker facilities for the women in the departments, add proper storage
facilities for medicine and weapons, add adequate garage space for a portion of
the Police fleet, and enhance our administrative offices (desk space) so that
the officers have adequate area to complete their reporting and train
effectively.
What is the cost of
these repairs and add ons? Estimates put them into the millions of dollars
which we will detail for you at Town Meeting, not much different than the cost
of the replacement building, and we end up with a building that is less
valuable and far less functional than what we would have with a replacement and
what we need to function effectively.
Today’s Public Safety Departments are challenged by a very dangerous
world, even in Norfolk. Fires, motor vehicle accidents, motor vehicle
violations and animal issues are the norm. Unfortunately potential tragedies
such as missing persons, murder, suicide, domestic violence, armed assault and
many other violent and tragic events are becoming more and more common and have
been and will sadly be a reality in Norfolk. We need to provide a facility
where these men and women can perform their duties well, where they can conduct
their administrative duties, perform training, have the tools and facilities to
be prepared to respond to the realities that we all face on an all too regular
basis.